// REGULATORY EXPERTISE & OPERATIONAL GUIDE

B2B Frequently Asked Questions, Customs & Trade Finance.

Clear answers from our experts in procurement engineering, customs regulations (ADII, PortNet), bank financing (L/C) and Moroccan logistics.

📑
EUR.1 AGREEMENT
0% Customs Duties
Valid Morocco – Turkey FTA
💳
UCP 600 RULES
Documentary Credit L/C
Total banking security
🔍
ISO 2859-1 (AQL)
PSI Factory Inspection
Pre-shipment inspection
⏱️
PORTNET & ADII
Zero Demurrage
Upstream DUM anticipation
// FREQUENT REGULATORY & COMMERCIAL QUESTIONS

All the answers to secure your B2B supplies

CUSTOMS & TAXATION // Q01

How to benefit from the 0% customs rate in Morocco?

Thanks to the bilateral Free Trade Agreement, the majority of industrial and construction goods manufactured in Turkey benefit from a 0% preferential customs duty, subject to the presentation of a valid EUR.1 certificate of origin issued by the Turkish customs authorities.

Amedian Control: Verification of conformity of the EUR.1 certificate and HS nomenclature prior to any factory departure.

FINANCING & BANKING // Q02

What payment methods are accepted?

We accept irrevocable and confirmed Letters of Credit (L/C) (subject to ICC UCP 600 rules), Documentary Collection (CAD) via Moroccan banks, and phased T/T wire transfers with bank guarantees for advance payment return.

Local Option: Possibility of invoicing in Moroccan Dirhams (MAD) for resident companies.

QUALITY & PRIVATE LABEL // Q03

How are minimum order quantities (MOQ) managed?

For private label manufacturing (OEM/ODM), we pool orders with our partner factories to negotiate reduced entry thresholds and optimize industrial tooling costs.

PSI Audit: Each production is subject to ISO 2859-1 quality control before shipment.

LOGISTICS & LEAD TIMES // Q04

What are the average delivery times to Morocco?

Direct maritime transit between Turkish ports and Casablanca / Tanger Med takes 5 to 7 days at sea. Our Casablanca hub then allows on-site delivery within 24 to 48 hours after customs clearance.

Turnkey Package: CIF or DDP delivery options according to your operational preference.

// TAILORED REGULATORY CONSULTING & ASSISTANCE

Do you have a specific question about your procurement project?

Our procurement engineers and PortNet/ADII regulatory specialists analyze your technical file within 24 hours.